EasyManua.ls Logo

SolarEdge StorEdge SE7600A-USS - Appendix D: Inverter Arc Detection and Interruption

SolarEdge StorEdge SE7600A-USS
120 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Appendix D: Inverter Arc Detection and
Interruption
Anelectricarcisanongoinghigh-energydischarge,resultingfromacurrentthroughanormallynon-
conductivematerialsuchasair.
WhenconnectersorcablesinaPVsystemareimproperlyconnectedoraredamaged,theelectric
currentmaypassthroughtheair,causinganelectricarc.Arcsgenerateheatwhichcancausefiresand
theyalsoposeanelectrocutionrisktothoseworkingnearthem.
SolarEdgeinverterscandetectarcsandinterruptproduction.Aqualifiedpersonmustre-enablethe
inverterafterproperlycheckingtheinstallation.
Thearcdetectionoptionisdisabledbydefault.ItmustbeenabledwhenUL1699Bcomplianceisrequired.
To enable/disable arc detection:
1. EnterSetupmodeandscrolltotheMaintenancemenu.
2. SelectAFCI èEnableorDisable.
To manually test the arc detection functionality:
1. MakesuretheinverterON/OFFswitchisturnedON.
2.
UsetheLCDlightbuttontoselectMaintenance èManual AFCI Test.
l
Ifthetestissuccessful,thefollowingmessageisdisplayed:
M a n u a l T e s t P A S S
Theinverterproductionistheninterrupted(asifarealarcdetectionhasoccurred),and
thefollowingerrormessageisdisplayed(numberedeither150or151):
E r r o r C o d e 1 8 x C
A r c F a u l t D e t e c t e d
Performmanualrestarttoresumesystemoperation:TurntheinverterON/OFFswitchto
OFFandthentoON.Theinverterperformsanarcdetectionself-testandstartsnormal
operation.
l Ifthetestfails,contactSolarEdgesupport.
SolarEdge StorEdge Installation Guide MAN-01-000262-1.2
102
Appendix D: Inverter Arc Detection and Interruption

Table of Contents

Other manuals for SolarEdge StorEdge SE7600A-USS

Related product manuals