6.11 Installation Checklist
Check the mechanical and electrical installation of the PCS after the above-mentioned oper-
ations. Go through the checklist below with the aid of another person.
Make records during checking. Make improvements once any unconformity is found.
Mechanical Installation
The PCS is intact without distortion or damage
The PCS bottom is reliably fixed and supported
The clearance spaces around the PCS are sufficient
The PCS ambient temperature, humidity and ventilation meet the requirements
Cooling air circulates smoothly
Cabinets are integrated and reliably sealed
Electrical Installation
The PCS is grounded properly and reliably
The grid voltage matches the nominal output voltage of the PCS
Grid side connection sequence is correct and the torque meets requirements
Polarities of the DC input are correct and the torque meets requirement
Communication cables are connected correctly and far away from other cables
Marks on the cables are correct, clear and distinguishable
Insulation protection cover is reliable and intact; warning labels are clear and
distinguishable
6 Electrical Connection User Manual

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sungrow SC1200UD-US and is the answer not in the manual?

Sungrow SC1200UD-US Specifications

General IconGeneral
BrandSungrow
ModelSC1200UD-US
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals