132
Design direct transmission
The bar tack machine must be ready to receive a design on the edit screen
from SSP. Refer to the following.
The following procedures are intended to describe the design transmission
process step by step.
Info Check “Bar Tack M/C Type” in “Rom Data I/O” category on the menu tool,
before starting this function.
1. Turn on the power and press
Reset at the same time.
Prog (programming) will be
displayed on the LED of OP and
the mode will change into
transmission ready.
Power