EasyManua.ls Logo

Suzuki RM-Z250 - Page 115

Suzuki RM-Z250
219 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DISASSEMBLY AND ASSEMBLY 4-35
Push Rod
Inspect the push rod for wear and damage.
If any defects are found, replace the push rod with a new one.
Release Bearing
Inspect the clutch release bearing 1 for any abnormality, par-
ticularly cracks, to decide whether it can be reused or should
be replaced.
Smooth engagement and disengagement of the clutch
depends on the condition of this bearing.
If any defects are found, replace the clutch release bearing
with a new one.
INSTALLATION
Install the clutch plates in the reverse order of removal. Pay
attention to the following points:
Install the spring washer seat 1 and spring washer 2 onto
the clutch sleeve hub correctly.

Table of Contents

Other manuals for Suzuki RM-Z250

Related product manuals