EasyManua.ls Logo

Tailift TPR720A - The Order to Pack

Tailift TPR720A
86 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-3
4.2.3 The order to pack
Please pack according the following procedure:
1.
P
lace the base plate 1 under the machine and have both the plate and the machine
fastened with bolts.
2.
Install the side plate 2.
3.
Install the side plate 3.
4.
Install the side plate 4.
5.
Install the side plate 5.
6.
Install the top plate 6 and pack it.

Table of Contents

Related product manuals