EasyManua.ls Logo

Tailift TPR720A - The Test after Installation; The Procedure for Dismantling the Machine

Tailift TPR720A
86 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-6
4.4 The test after installation.
a.
Have the main power on.
b.
Press the emergent stop button to see whether it stops immediately.
c.
Power on again.
d.
Please check whether the motor is running smoothly. If there is any errors, Please
select two of the wires L1, L2 and L3 and change its position.
e.
Check every mechanism to see whether it works normally.
4.5 The procedure for dismantling the machine.
The dismantling procedure is the reverse of the installation one.

Table of Contents

Related product manuals