EasyManua.ls Logo

Tait TM9100 - Final Inspection; Final Test; Final Administration

Tait TM9100
484 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TM9100 Service Manual Servicing Procedures 149
© Tait Electronics Limited August 2005
8. On receiving the licence file, run the programming application on the
test PC. On the menu bar click To ol s > Optional Features.
The Software Feature Enabler dialog appears.
9. Use the licence file to enable the appropriate software features.
The procedure is given in the on-line help facility under the heading
Enabling a feature. Go to Task 3
.
Task 3
Final Inspection
Make a final inspection of the exterior to check that no mechanical parts
were damaged during the repair. Repeat the inspection given in “Visual
Inspection” on page 139. Rectify any damage.
Task 4
Final Test
Test the radio to confirm that it is fully functional again. The recommended
tests are listed in Table 6.2 to Table 6.4. (The calibration application can be
used for many of these tests.) It is good practice to record the test results on
a separate test sheet. A copy of the test sheet can be supplied to the Customer
as confirmation of the repair.
Task 5
Final
Administration
The final administration tasks are the standard workshop procedures for
updating the fault database and returning the repaired radio to the Customer
with confirmation of the repair.
If the radio could not be repaired for one of the following reasons:
fault not located
repair of fault failed
required repair is level-3 repair
Level-1 service centers should return the faulty radio to the nearest ASC,
and level-2 service centers should return the radio to the ISC. Supply details
of the Customer, the fault and, if applicable, the attempted repair.

Table of Contents

Other manuals for Tait TM9100

Related product manuals