4. If parked regeneration is still not initiated, a standard 60 second engine shutdown
sequence will occur. The dash lights will have a yellow blinking light and a solid red
light. Once the engine shutdown sequence is completed, a parked regeneration MUST
occur to continue crane operations. If the engine is operated without regeneration,
additional measures will be taken to protect the engine and ATD from damage, up to
and including engine shutdown which will require the engine dealer to reset the
regeneration sequence.
NOTE: If the DDEC Vl electronics have not requested the initiation of a parked
regeneration (The yellow light is not illuminated), the regeneration request switch will
be disabled. Regeneration is only possible with the yellow light lit.
NOTE: Times between illuminations of lights will vary with engine brand. Typically
the time from solid yellow - to blinking. 2 - 6 hrs; yellow - to solid red, 1 - 2 hrs of
operating time.
161P/N 12261-683 REVISED: January 2015