EasyManua.ls Logo

Terex T780 - Hoist-Line Reeving

Terex T780
528 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Insert the wedge (1) and allow the rope strands to adjust around it.
3. Seat the wedge and loop just tightly enough to allow handling by attaching the socket
to a strong support and engaging the winch to take a strain on the rope.
4.
Final seating of the wedge is accomplished by making lifts of gradually increasing
loads. Avoid imposing shock loading on the rope until the wedge is firmly in place.
5. After the wedge has been firmly seated, a short length (6 inches) of the cable should
be secured to the free end of the wire rope to act as a stop as shown. DO NOT clamp
the free end to the load supporting end as this will weaken the rope.
T300-1_T500-1_T780
Assembly
72 P/N 12261-683
REVISED: January 2015

Table of Contents

Related product manuals