5.3 Systems with four tanks (Systems 12 and 16)
If the value of "dT" (T1 minus T2/T3/T7/T8) reaches the value required for charging, tanks 1/2/3/4 are
separately charged until the tanks reach the maximum temperature.
If T1>T2 and T2<T2 max (regardless of T3, T7 and T8)
Synchronously charge tank 2
Priority charging time/priority pause time
If T1>T7 and T2>T2 max and T3<T3 max
Synchronously charge tank 3
Priority charging time/priority pause time
If T1>T7 and T2>T2 max and T3>T3 max and T7<T7 max
If T1>T8 and T2>T2 max and T3>T3 max and T7<T7 max
Synchronously charge tank 4
Priority charging time/priority pause time
If T1>T8 and T2>T2 max and T3>T3 max and T8>T8 max
If T1>T2/T3/T7/T8 and T2>T2 max and T3>T3 max and T7>T7
max and T8>T8 max