EasyManua.ls Logo

Trane Tracer Summit - Communication-Link Field Wiring for the BCU (BMTS)

Trane Tracer Summit
272 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Communication-Link Field Wiring for the BCU (BMTS)
BMTW-SVN01F-EN 227
Figure 99. UCM Communication Card Installation
Communication-Link Field Wiring for
the BCU (BMTS)
All Tracer Summit communication-link wiring is low voltage Class 2 and
must be field-supplied and installed in compliance with NEC and local
codes. To prevent electrical noise interference, all communication-link
wiring must also comply with the requirements outlined in this section
for wire selection and individual link configuration. Fiber optic UCM
communication is also available where extreme distance, electrical noise
immunity, or building-to-building communication is required. See
Figure 100 on page 228 for an example of typical UCM-communication-
link wiring.

Table of Contents

Other manuals for Trane Tracer Summit

Related product manuals