EasyManua.ls Logo

Trane TRACER SUMMIT BMTX-SVU01B-EN User Manual

Trane TRACER SUMMIT BMTX-SVU01B-EN
246 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
BMTX-SVU01B-EN
Daily Operations
TRACER SUMMIT
Version 17

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Trane TRACER SUMMIT BMTX-SVU01B-EN and is the answer not in the manual?

Trane TRACER SUMMIT BMTX-SVU01B-EN Specifications

General IconGeneral
BrandTrane
ModelTRACER SUMMIT BMTX-SVU01B-EN
CategoryControl Unit
LanguageEnglish

Summary

Getting Started

Tracer Summit Software

Explains the role of Tracer Summit software in controlling HVAC units and its core functions.

Tracer Summit Hardware

Details the hardware components of the Tracer Summit system, including PC Workstations and BCUs.

Using the Daily Operations Tutorial

Using the Tutorial within Tracer Summit Software

Details how to access and use training modules directly from the Tracer Summit software interface.

Opening and Closing Tracer Summit

Opening Tracer Summit

Provides step-by-step instructions on how to launch the Tracer Summit application.

Logging On to and Off of Tracer Summit

Logging On to Tracer Summit

Guides users through the process of accessing Tracer Summit with a valid username and password.

Using Terminal Emulation and Keyboard Macros

Accessing Terminal Emulation

Guides users on how to start a terminal emulation session to access Tracer 100 or Tracker sites.

Displaying and Changing Status Information

Displaying Status Information on Graphics

Describes how to view live data and system status information displayed on graphical interfaces.

Changing System Values (Overrides and Setpoints)

Details how to modify system values, including setpoints and overrides for various objects.

Overriding System Values

Explains how to override system control of present values using override controls.

Setting Up the Simplified Override Dialog Box

Guides users on configuring the simplified override dialog for easier value changes.

Using the Advanced Systems Override

Covers advanced override functions, including controlling objects and setting priorities.

Changing Schedules

Changing Start or End Times of Events

Details the procedure for modifying the start and end times of events within a schedule.

Handling Alarms and Events

Displaying the Event Log

Explains how to view the event log to check site status, respond to alarms, and check error messages.

Acknowledging an Alarm

Details the process for acknowledging alarms that require operator attention.

Running Reports

Using the Trend Viewer

Creating a Trend Viewer

Provides step-by-step instructions for creating new Trend Viewer objects.

Backing up Tracer Summit

Changing Chiller Plant Status Information

Resetting Chiller Failures

Guides users on resetting individual or all chiller failures within the system.

Related product manuals