Changing Schedules
94 BMTX-SVU01B-EN
Handling Holidays for BCU Panels
You can define holidays for BCU and Tracer 100 sites. If you are using a
Tracer 100 panel, see the section “Handling Holidays for Tracer 100 Pan-
els” on page 98.
Apply an Existing Holiday to a Schedule
You can apply a holiday (for example, New Year’s Day) to a schedule by
following the steps in this section.
To apply an existing holiday to a schedule:
1. Select the desired day on the calendar and change the daily events to
represent the holiday.
2. Click the Holiday button (see Figure 82 on page 95). The Define Holi-
day window displays (see Figure 83 on page 95).
3. Select the Existing Holiday button.
4. Select the desired holiday from the Existing Holiday list box.
5. Click Save. The holiday displays in blue on the calendar. The name of
the holiday displays above the clock grid.
Note:
The Holiday button is not active unless you have changed
events for the selected day. If you want to simply apply a holi-
day and not change a day’s events, click once on an event time
bar for the day, then click OK at the Change Event Times win-
dow. The Holiday button becomes active.