EasyManua.ls Logo

Trane Tracer Summit - Page 83

Trane Tracer Summit
272 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 4 UCM Communication-Link Wiring
68 BMTW-SVN01F-EN
optic cables and professionally spliced and/or terminated cables should
ensure minimal decibel loss.
To calculate the system loss, subtract the cable loss, splice loss, termina-
tor loss, and patch panel loss from the power budget. The example below
shows typical values for the UCM communication link.
power budget – system safety margin = available budget
14 dB – 3 dB = 11 dB (available budget)
available budget: 11 dB
cable loss: – 7.5 dB (1 km at 3.75 dB/km)
allowance for splice loss: – 1 dB (2 at .5 dB)
allowance for end connectors: – 1 dB (2 at .5 dB)
allowance for patch panel: – 1 dB (2 at .5 dB)
excess margin: = 0.5 dB

Table of Contents

Other manuals for Trane Tracer Summit

Related product manuals