Enkapsis & EnerSure Platform Installation Guide Rev07.2
THE GROUND CONNECTION TO THE ENKAPSIS PQM IS MADE DIRECTLY
FROM A STABLE GROUND CONNECTION ON YOUR POWER PANEL. THE
GROUND CONNECTION DIRECTLY TO THE ENKAPSIS IS ABSOLUTELY
MANDATORY AND USE WITHOUT THIS GROUND WILL VOID YOUR
WARRANTY AND CREATE A SAFETY HAZZARD.
THE GROUND CONNECTION TO THE ENKAPSIS PQM IS MADE DIRECTLY
FROM A STABLE GROUND CONNECTION ON YOUR POWER PANEL. THE
GROUND CONNECTION DIRECTLY TO THE ENKAPSIS IS ABSOLUTELY
MANDATORY AND USE WITHOUT THIS GROUND WILL VOID YOUR
WARRANTY AND CREATE A SAFETY HAZZARD.
Figure 4: Wiring Diagram for 120/208VAC Three Phase Wye Configuration