6-1
CHAPTER 6
Maintenance
R e c h a r g i n g t h e B a t t e r y
The fastest charging method is to charge the internal batteries with the  Plus Flow
Analyzer Test System turned off. With new batteries and the  instrument turned off, the
charging time to go from empty to a full charge is approximately 4 hours. When connected to AC
power, the  Plus Flow Analyzer will charge the internal batteries during operation;
however, the time to full charge will be extended. The batteries cannot be charged externally from
the Certifier Flow Analyzer.
The Interface Module can be powered by internal Lithium-Ion battery or an AC power adapter can be
used. If the AC adapter is delivering power to the Certifier Interface Module and the battery is installed,
a lightning bolt symbol will be displayed in the battery icon to indicate active battery charging.
R e p l a c i n g t h e B a t t e r y
The Certifier Plus Flow Analyzer comes with the battery pre-installed into the 4089 Interface Module.
The battery will function for four or more years with normal operation of the Certifier Plus test system.
To remove or install a battery, a Philips-head screwdriver is required.
To remove a battery from the Certifier Plus Flow Analyzer:
Turn the Certifier Interface Module off and disconnect any cables
Remove the protective cover (if attached)
Remove the cover on the back side of the Certifier case by unscrewing the 3 screws
Disconnect the battery pack by unplugging the pigtail connector from the Certifier Flow Analyzer