Check the toroidal transformer in relation to the mains voltage
The machine is fitted with a multi-voltage transformer to ensure that the supply to the electronics is at the
right voltage.
The machine is factory set according to its country of destination.
E.g.:
If it is necessary to change the factory setting, only the jumpers should be repositioned: no wiring should be
moved.
Switching on
When the power is switched on the machine performs an initialisation cycle that checks all the components;
the starting up time is approximately 45sec.
Never start up with the USB dongle inserted in the side of the machine