Disassembly/Assembly Mobile Generator
96 wc_tx000575gb.fm
9.10 Removing the Engine
See Graphic: wc_gr003351
This procedure requires an appropriate crane capable of lifting 1000 kg
(2200 lbs.).
9.10.1 Remove the roof. See section Removing the Roof.
9.10.2 Remove the generator. See section Removing the Generator.
9.10.3 Remove the battery.
9.10.4 Disconnect the wiring harness (a) from the engine.
9.10.5 Disconnect and plug the fuel line (b) at the fuel filter.
9.10.6 Using an appropriate hoist or crane, lift the control panel enclosure
from the frame.
9.10.7 Drain the radiator.
9.10.8 Disconnect the radiator hoses (c) from the engine.
9.10.9 Disconnect the exhaust pipe (d) from the engine. Loosen the clamp at
the muffler and rotate the exhaust pipe away from the engine.
9.10.10 Disconnect the fuel return line (e).
9.10.11 Remove the fan guard (f).
9.10.12 Disconnect the ground strap (g) from the engine.
9.10.13 Disconnect the engine from the frame by removing the screws that
secure the shock mounts.
9.10.14 Using as appropriate hoist or crane, lift the engine up and out of the
frame.