98 wc_tx000575gb.fm
9.11 Installing the Engine
See Graphic: wc_gr003352
This procedure requires an appropriate crane capable of lifting 1000 kg
(2200 lbs.).
9.11.1 Using as appropriate hoist or crane, lower the engine into the frame.
9.11.2 Secure the engine to the frame with the screws that secure the shock
mounts.
9.11.3 Connect the ground strap (g) to the engine.
9.11.4 Install the fan guard (f).
9.11.5 Connect the fuel return line (e).
9.11.6 Connect the exhaust pipe (d) to the engine. Tighten the clamp at the
muffler.
9.11.7 Connect the radiator hoses (c) to the engine.
9.11.8 Fill the radiator with coolant.
9.11.9 Using an appropriate hoist or crane, lower the control panel enclosure
onto the frame.
9.11.10 Connect and the fuel line (b) to the fuel filter.
9.11.11 Connect the wiring harness (a) to the engine. Secure the harness as
necessary with wire ties.
9.11.12 Install the battery.
9.11.13 Install the generator. See section Replacing the Generator.
9.11.14 Install the roof.