EasyManuals Logo

Wacker Neuson LTV 4L User Manual

Wacker Neuson LTV 4L
106 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #58 background imageLoading...
Page #58 background image
Operation
7.3 Raising and Lowering the Tower
58
Operator’s Manual | LTV 4L/6L | 5100065071 | 02/2023 | [en-US]
wc_gr013770
1
wc_gr013771
1
Fig.30: Telescoping winch—raising and lowering
2. Continue rotating the winch handle until the tower is at the desired
height. Do not overcrank the winch when the tower is fully extended.
Lowering the tower using the manual winch
Turn the handle on the telescoping winch (1) counterclockwise (“cable out”
direction) until the tower is lowered completely.
Raising the tower using the power winch
1. Check the operation of the telescoping winch (1). Turn the telescope
rotary switch (2) on the control panel to the UP position.
wc_gr013772
1
2
wc_gr013773
2
Fig.31: Telescoping winch—raising and lowering
2. Continue to hold the telescope rotary switch until the tower is at the de-
sired height. Release the switch when the tower is at the desired
height.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson LTV 4L and is the answer not in the manual?

Wacker Neuson LTV 4L Specifications

General IconGeneral
BrandWacker Neuson
ModelLTV 4L
CategoryWork Light
LanguageEnglish

Related product manuals