Periodic Maintenance to the Enre Installaon: Weekly,
Quarterly, Semi-Annually, General (Repair and Addional)
Maintenance is essenal in order to guarantee the safety and the sasfactory operaon of the SpeedGate.
Maintenance checks should be conducted only by qualied maintenance personnel. The following
maintenance interval checklists are provided to record repair requirements, maintenance performed and
addional observaons pernent to the SpeedGate. Checklists must be dated, signed and retained for
record-keeping purposes.
Turn OFF power to the gate whenever assembly and maintenance acvies
are being carried out.
Aer turning o the controller, dangerous voltage levels remain present
for up to 5 minutes. Touching electronic components is dangerous due to
residual voltages. Never operate the controller while the cover is removed.
SpeedGate Weekly Maintenance Checklist
1-SPEEDGATE WEEKLY MAINTENANCE CHECKLIST Checked Good Needs
Aenon
N/A
SpeedGate Serial Number:
To be carried out by end user the rst workday of every week:
1. Perform a general visual inspecon.
2. Check that lighng at the SpeedGate site is in good
working order.
3. Check that the SpeedGate is in good working order,
in conformance with UL standards. Test the Gate
System. The gate MUST react as programmed
(e.g., stop/reverse on contact with a rigid object).
The gate MUST react as programmed (e.g., stop/
reverse when an object breaks the photo eye
infrared beam) while the gate is in the Closing
cycle. Failure to properly test inherent and external
entrapment devices on a weekly basis can increase
the risk of injury or death.
4. Check that the Reduced Speed/Torque Change
Sensor (the inherent entrapment sensor) is in good
working order.
PERIODIC MAINTENANCE TO THE ENTIRE INSTALLATION: WEEKLY, QUARTERLY, SEMI-ANNUALLY, GENERAL (RE-