EasyManua.ls Logo

Wallace Perimeter Security SPEEDGATE - Speedgate Quarterly Control Maintenance Checklist

Wallace Perimeter Security SPEEDGATE
142 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SPEEDGATE Installation and Maintenance Manual Revision 1 - MAY 2023
131
SPEEDGATE QUARTERLY CONTROL MAINTENANCE CHECKLIST
1-SPEEDGATE WEEKLY MAINTENANCE CHECKLIST Checked Good Needs
Aenon
N/A
5. Clean photo eyes (external entrapment protecon
sensors) with a so, clean, dry cloth and ensure
they are in good working order.
6� If used in parcular applicaon: Check that
the gate edges (external entrapment protecon
sensors) are in good working order.
7� If used in parcular applicaon: Check that the
vehicle detecon loops are working.
Comments/Recommendaons:
Customer Signature: Customer Name (Print):
Signature of Maintenance Inspector: Maintenance Check Performed by (Print Name):
Date:
Date of next Maintenance Inspecon:
Cycle Count:
SpeedGate Quarterly Control Maintenance Checklist
2-SPEEDGATE QUARTERLY (EVERY THREE MONTHS)
CONTROL MAINTENANCE CHECKLIST
Checked Good Needs
Aenon
N/A
SpeedGate Serial Number:
To be carried out by maintenance personnel:
1. Perform a general visual inspecon.
2. Visually inspect the Operator cabinet for moisture.
3. Visually inspect the Operators for moisture.

Table of Contents

Related product manuals