EasyManua.ls Logo

Wallace Perimeter Security SPEEDGATE - Page 136

Wallace Perimeter Security SPEEDGATE
142 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
136
wallaceperimetersecurity.comPhone: 866.300.1110
SPEEDGATE GENERAL MAINTENANCE CHECKLIST
5-SPEEDGATE GENERAL MAINTENANCE CHECKLIST Checked Good Needs
Aenon
N/A
9. Accessory devices secure in cabinet (loop relays,
etc).
10. Auto-close mer, interlock funconal (if enabled).
11. Cabinet thermal cover installed correctly (if
equipped).
12. Center catch shoe funconal/secure (if installed).
13. Control cabinet clean/dry.
14. Control cabinet fasteners secure.
15. Heater operaonal (if equipped).
16. Sensing edges - no rips/tears, funcon OK (if
equipped).
17. Obstrucon loop/free exit loop (i.e., Channel 1 or
Channel 2 Loop, as programmed) - operaonal/
good condion (if equipped).
Comments/Recommendaons:
Customer Signature: Customer Name (Print):
Signature of Maintenance Inspector: Maintenance Check Performed by (Print Name):
Date:
Date of next Maintenance Inspecon:
Cycle Count:

Table of Contents

Related product manuals