EasyManuals Logo

Zebra MC93 Series Integrator Guide

Zebra MC93 Series
186 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #61 background imageLoading...
Page #61 background image
Accessories
61
5. Secure the top screws.
6. Install bottom screws and tighten screws.
7. Route cables and connect to power source.
CAUTION: Installer should ensure that all building codes are followed when connecting the power supplies to an AC power
source.
While installing the brackets, power supplies and cables:
Use tie wraps to secure cables to the bracket and rails.
Coil cables wherever possible.
Route power cables along the rails.
Route inter-cradle cables to the side rails and then from the rails to the bracket.

Table of Contents

Other manuals for Zebra MC93 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Zebra MC93 Series and is the answer not in the manual?

Zebra MC93 Series Specifications

General IconGeneral
Operating Temperature-4°F to 122°F/-20°C to 50°C
ProcessorQualcomm Snapdragon 660 octa-core, 2.2 GHz
Operating SystemAndroid 11
RAM4 GB
Storage32 GB Flash
Battery7000 mAh
ConnectivityUSB 2.0
Camera13 MP rear camera
Drop SpecificationMultiple 8 ft. / 2.4 m drops to concrete per MIL-STD 810G across operating temperature range
SealingIP65
Touch PanelCapacitive Corning Gorilla Glass
Keypad OptionsNumeric, Function Numeric, Alpha-Numeric
Scanning1D/2D
Wireless LAN802.11 a/b/g/n/ac
AudioSpeaker, microphone
Display4.3 in. WVGA (800 x 480), color TFT-LCD with backlight

Related product manuals