EasyManua.ls Logo

ZOLL EMV+ - Page 108

ZOLL EMV+
228 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Service Kit Installation Procedures
906-0731-04-01 Rev. C ZOLL Ventilator Service Manual 4–53
3 Place the replacement cover over ventilator, then
align the cover with the handle, air intake housing
and dovetail mounting studs.
Insert and tighten the two 10-32 Keps nuts
(provided in the kit) and the four 6-32 x 2” screws.
4 Tighten the four 8-32 x 3 screws on the outer air
intake.
5
Re-certify the ventilator using the RCS.
Step Action

Table of Contents

Other manuals for ZOLL EMV+

Related product manuals