Service Kit Installation Procedures
906-0731-04-01 Rev. C ZOLL Ventilator Service Manual 4–67
3 Place fitting and O-ring unto Gas Output and
tighten with a socket wrench that has a 1 in. deep
well socket.
Torque to 75 in-lbs.
Note: Do not cross thread.
4 Re-certify the ventilator using the RCS.
Step Action