EasyManua.ls Logo

3D Systems CubePro - Page 60

3D Systems CubePro
89 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
563D Systems, Inc.
12. (1) Push the front of the cartridge into place and then (2) push the cartridge
handle downward until the cartridge is fully seated in its mount. Select the
checkmark to continue.
NOTE: Ensure the front of the cartridge (A) where the material exits
is seated under the clamp roller and between the vertical alignment
pins in the cartridge bay.
CAUTION: If replacing the third cartridge, be sure to rotate the
second bay cartridge to its vertical position before selecting the
checkmark.
A
1
2

Table of Contents

Other manuals for 3D Systems CubePro

Related product manuals