ABB A145-M65 - Fig. 23: Carrying out Wet Cleaning of Turbines; Table 14: Wet Cleaning of Turbines, Parameters

ABB A145-M65
142 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / 4 Product description / A130-M.. - A145-M..
6 Periodic maintenance work / 6.3 Cleaning the turbine during opera-
tion
© Copyright 2017 ABB. All rights reserved. HZTL4031_EN Revision F August 2017
Fig.23: Carrying out wet cleaning of turbines
u Fulfil prerequisites.
u Ensure that the water supply (01) is guaranteed.
u Open the stop valve (02) and set the water volume flow V
W
with a flowmeter (03) (see
cleaning parameters).
u Close the stop valve (02) after 10minutes.
u Wait for 10minutes; do not change the load during this stabilisation phase.
If the cleaning result is unsatisfactory or there is water leakage, contact an ABB Turbochar-
ging Service Station.
Product Temperature be-
fore turbine before
cleaning [°C]
Maximum temper-
ature before tur-
bine during clean-
ing [°C]
Water volume flow
V
W
[dm
3
/min]
1)
Injection time
[min]
A130 350 ... 430 530 4.0 10
A135 350 ... 430 530 5.5 10
A140 350 ... 430 530 8.5 10
A145 350 ... 430 530 12.0 10
Table14: Wet cleaning of turbines, parameters
1)
Corresponds to a water pressure p
WT
of 1.5bar (overpressure compared to atmosphere)