Quick installation and commissioning flowchart
SeeTask
Type designation key (page 36)
Identify the frame size: R0, R1, R2, etc.
Guidelines for planning the electrical installa-
tion (page 45)
Plan the installation.
Check the ambient conditions, ratings and
required cooling air flow.
Technical data (page 131)
Unpacking the delivery (page 41)
Unpack and check the delivery.
Grounding system compatibility check –
IEC (page 65)
If the supply network is not a symmetrically
grounded TN-S system, make sure that the
drive is compatible with the grounding sys-
tem.
Grounding system compatibility check –
North America (page 93)
Installing the drive (page 41)
Install the drive.
Routing the cables (page 55)
Route the cables.
Measuring the insulation resistance -
IEC (page 64)
Measure the insulation of the input cable,
motor and motor cable.
Measuring the insulation resistance - North
America (page 92)
Connecting the power cables – IEC (shielded
cables) (page 71)
Connect the power cables.
Connecting the power cables – North America
(wiring in conduits) (page 99)
Connecting the control cables - IEC (page 74)
Connect the control cables.
Connecting the control cables - North Amer-
ica (page 102)
Installation checklist (page 119)
Examine the installation.