EasyManua.ls Logo

ABB ACH480 - Installing a front option

ABB ACH480
264 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Side option: Multifunction extension module slot on the side of the drive.
Refer also to the applicable fieldbus module manual for the installation instructions.
For other option modules, refer to:
BREL-01 relay output extension module (page 257)
BAPO-01 auxiliary power extension module (page 247)
BIO-01 I/O extension module (page 251).
Installing a front option
WARNING!
Obey the safety instructions of the drive. If you ignore them, injury or death,
or damage to the equipment can occur. If you are not a qualified electrical
professional, do not do installation, commissioning or maintenance work.
1. Do the steps in section Electrical safety precautions (page 18) before you start
the work.
2. Remove the screw on the drive front cover and lift the front cover up.
3. If the option module has a locking tab, pull it up.
4. Carefully align the option module with the option module slot and push it into
position.
5. Torque the screw to 0.5 N·m (4.4 lbf·in).
6. If the option module has a locking tab, push it down until it locks.
7. Connect the control cables. See the control cable connection instructions.
2
2
Electrical installation IEC 87

Table of Contents

Other manuals for ABB ACH480

Related product manuals