EasyManua.ls Logo

ABB ACS880-01 - Electrical Installation - North America; Contents of this Chapter; Safety; Required Tools

ABB ACS880-01
302 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
Electrical installation North
America
Contents of this chapter
This chapter gives instructions on wiring the drive.
Safety
WARNING!
If you are not a qualified electrical professional, do not do installation or
maintenance work. Obey the safety instructions of the drive. If you ignore them,
injury or death, or damage to the equipment can occur.
Required tools
To do the electrical installation, you need the these tools:
wire stripper
screwdriver set (Torx, flat and/or Phillips, as appropriate)
torque wrench.
Measuring the insulation
Measuring the insulation is typically not required in North American installations. If
measuring is needed, see the instructions in chapter Measuring the insulation (page 90).
Electrical installation North America 117

Table of Contents

Other manuals for ABB ACS880-01

Related product manuals