EasyManua.ls Logo

ABB ACS880-01 - Connection Procedure for Frames R6 to R9

ABB ACS880-01
302 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
R4:
6
M4×10 Torx T20
2 N·m
R5:
K40×12 tapping screw (2 pcs)
1.5 N·m
Connection procedure for frames R6 to R9
Install the control cable grounding shelf in the cable entry box.
1. Fasten the cable conduits to the cable lead-through plate holes. Slide the cables
through the connectors.
2. Strip the cable ends and cut to suitable length (note the extra length of the grounding
conductors).
3. Ground the outer shields of all control cables 360 degrees at a grounding clamp in
the cable entry box.
4. Ground the pair-cable shields to a grounding clamp below the control board. Leave
the other end of the shields unconnected or ground them indirectly via a
high-frequency capacitor with a few nanofarads, eg, 3.3 nF / 630 V.
5. Connect the conductors to the appropriate terminals of the control board.
6. Wire the optional modules if included in the delivery. For connecting the fieldbus
cables, see ACS880-01 quick installation guide for frames R6 to R9
(3AUA0000099689 [English]).
7. Reinstall the front covers.
134 Electrical installation North America

Table of Contents

Other manuals for ABB ACS880-01

Related product manuals