EasyManua.ls Logo

ABB ACS880-04 - Installation Checklist; Contents of this Chapter; Checklist

ABB ACS880-04
418 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation checklist 145
6
Installation checklist
Contents of this chapter
This chapter contains a list for checking the installation of the ACS880-04 single drive
module packages.
Checklist
Check the mechanical and electrical installation of the drive before start-up. Go through
the checklist together with another person.
WARNING! Only qualified electricians are allowed to do the work described
below. Repeat the steps described in section Electrical safety precautions on
page 128. The complete safety instructions are given in Safety instructions for
ACS880 multidrive cabinets and modules (3AUA0000102301 [English]). Ignoring the
instructions can cause physical injury or death, or damage to the equipment.
Make sure that...
The ambient operating conditions meet the specifications given in chapter Technical data.
The cabinet is properly fastened to the floor. See Mechanical installation instructions for ACS880
multidrive cabinets (3AUA0000101764 [English]).
The cooling air flows freely.
There is sufficient free space around the cabinet. See Mechanical installation instructions for
ACS880 multidrive cabinets (3AUA0000101764 [English]).

Table of Contents

Other manuals for ABB ACS880-04

Related product manuals