42/24-10 EN Rev. 9  Chapter 9: Inspection and Maintenance  9-11 
Limas11: Aluminum Sample Cell Cleaning, continued 
 
Step Action 
Sample Cell Installation: 
10  Place the sample cell in its housing. The index pin should be on the 
side of the sample cell that is toward the beam splitter. Turn the 
sample cell in its housing until the index pin engages in the hole in the 
housing. 
11  Install the 2 mounting brackets 2 and secure them with the 4 screws 1.
12  Install the sample gas tubing or pipes on the sample cell ports and on 
the module’s rear wall. 
13  Check the integrity of the analyzer module gas paths (see page 9-2). 
Restarting the analyzer module: 
Close the system housing. 14 
 
Light penetration during operation leads to erroneous measure-
ment values and measurement range overflows (“Intensity” 
status message). 
15  Turn on the gas analyzer power supply. 
16  Wait for the warm-up phase to end. Start the sample gas supply. 
17 Check linearity. 
 
Figure 9-6 
 
Aluminum Sample 
Cell in the Limas11 
Analyzer Module 
 
 
1  Allen Screws (3 mm) 
2  Mounting Bracket 
 
Aluminum Sample 
Cell with Center 
Connection 
An aluminum sample cell with center connection is built-in in the Limas11UV ana-
lyzer module with Class 2 NO measurement ranges. In this version, the sample 
gas inlet is in the center and the sample gas outlets are at the ends of the sample 
cell. This has to be observed when re-installing the sample cell after cleaning.