7.1
Check list before startup
Before switching on the power, check as follows:
1. The mains supply fused rating.
2. The supply transformer in the cabinet is connected for the correct voltage.
3. The unused circuits in the safetychains must be closed by connecting jumpering:
Auto Stop: XS3 or XT3
Manual Stop: XS3 or XT3
General Stop: XS3 or XT3
Customer emergency stop XS3 or XT3
MOTOR OFF clamping device XS3 or XT3
External axes limit switches: XS3 or XT3
Ext.drive units POWER OK* XS3 or XT3
A3-A4andB3-B4
Al - A2 and Bl - B2
A5 - A6 and B5 - B6
A7
-
A8 and B7
-
B8,
A9 - A10 and B9-B10
Cl - C2 and Dl - D2
All-A12andBll-Bl2
C12 - C16
4. If the controller includes the external axes option, check that the external axes
connections are made, or the following circuits are jumpered:
Motor PTC, axis 7: XS7
7th(-12th) axes limit switches: XS7
5. The programming unit is connected.
D1-D2
A4
-
A5 and B4
-
B5
6. The operation modeselector on the operating panel is set to MANUAL
<250 nun/8.
INSTALLATION
S3
7:2