Installing the Chassis
7705 SAR-M Chassis Installation Guide 85
Figure 17 displays the components of a packed 7705 SAR-M chassis. Table 13 lists the 
7705 SAR-M packing components. 
Figure 17: Unpacking the 7705 SAR-M Chassis
To unpack the chassis, open the carton and follow these steps:
Step 1. Carefully lift the router out of the carton and place it on a flat surface. 
Step 2. Remove the package foam tray.
Step 3. Remove the protective anti-static wrapping when you are ready to install the router. 
Table 13: 7705 SAR-M Packing Components
Key Description
1 Shipping container
2 7705 SAR-M chassis (wrapped in an anti-static bag)
3 Package foam tray
1
22716
2
3
Note: Wear an anti-static wrist strap when unpacking the chassis to prevent damage to the 
equipment due to ESD.