Rockwell Automation Publication 6000-UM002E-EN-P - April 2018 129
Preventative Maintenance and Component Replacement Chapter 5
Final Report
A complete, detailed report on all steps in the Preventive Maintenance 
procedures should be recorded to identify changes. 
A detailed description of all adjustments and measurements that were taken 
during the process must be recorded (interlock adjustments, loose connections, 
voltage readings, insulation resistance (IR) test results, parameters, etc.).
Prepare Final Report
The Rockwell Automation Service Engineer will provide a maintenance report to 
the customer based on the outcome of the maintenance work. All steps in the 
preventive maintenance process will be recorded in detail in the report and will 
identify changes made.
The final report includes:
• A complete copy of the Preventive Maintenance Checklist.
• Problems found during the investigation process and rectification 
recommendations.
• Adjustments and measurements during maintenance (including 
mechanical adjustment, connection status, voltage reading, vibration test 
results, parameters, and so on).
This information will be sent to the PowerFlex 6000 Technical Support and 
Product Support for the latest on-site information for future maintenance and 
technical support.