EasyManuals Logo

Allied Telesis CentreCOM GS970M Series User Manual

Allied Telesis CentreCOM GS970M Series
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #90 background imageLoading...
Page #90 background image
Chapter : Chapter 2: Installation
80
6. Eject SFP transceivers, as shown in Figure 52. First lower the SFP
transceiver handle, then gently remove the SFP transceiver.
FIGURE 52. EJECTING AN SFP TRANSCEIVER AFTER LOWERING THE SFP
HANDLE TO THE DOWNWARDS POSITION
7. Repeat steps 2 through 6 to install an additional SFP transceiver.
Note
SFP transceivers are dust sensitive. Always keep the plug in the
optical bores when a fiber optic cable is not installed, or when
storing the SFP. When you do remove the plug, keep it for future
use.
Note
Unnecessary removal and insertion of an SFP transceiver can lead
to premature failure.
For information on the cable specifications of the SFP, consult the
documentation shipped with the SFP.
8. Go to “Cabling the switch” on page 69.
S
FP

Table of Contents

Other manuals for Allied Telesis CentreCOM GS970M Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Allied Telesis CentreCOM GS970M Series and is the answer not in the manual?

Allied Telesis CentreCOM GS970M Series Specifications

General IconGeneral
BrandAllied Telesis
ModelCentreCOM GS970M Series
CategorySwitch
LanguageEnglish

Related product manuals