EasyManua.ls Logo

Allied Telesis CentreCOM GS970M Series - Chapter 2: Installation

Allied Telesis CentreCOM GS970M Series
100 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GS9790M Series Switch Installation Guide
45
Chapter 2: Installation
This chapter contains the following sections:
“Reviewing safety precautions” on page 46
“Selecting a site for the switch” on page 48
“Cable specifications” on page 49
“Unpacking the switch:GS970M/10 and GS970M/10PS” on
page 50
“Unpacking the switch: GS970M/18 and GS970M/18PS” on
page 51
“Unpacking the switch: GS970M/28” on page 52
“Unpacking the switch: GS970M/28PS” on page 53
“Installing the switch on a table or a desktop” on page 54
“Removing the feet from a switch before installing it in an
equipment rack or on a wall” on page 55
“Installing a GS970M/10 switch in an equipment rack” on page 56
“Installing a GS970M/10PS switch in an equipment rack” on
page 59
“Installing a GS970M/18, GS970M/18PS or GS970M/28 switch in
an equipment rack” on page 61
“Installing a GS970M/28PS switch in an equipment rack” on
page 63
“Installing a GS970M/10 switch on a wall” on page 65
“Installing a GS970M/18, GS970M/28 or AT-GS970M PS Series
switch on a wall” on page 67
“Cabling the switch” on page 69
“Powering on the switch” on page 71
“Starting a local management session” on page 73
“Monitoring the initialization processes” on page 75
“Installing optional SFP transceivers” on page 78

Table of Contents

Other manuals for Allied Telesis CentreCOM GS970M Series

Related product manuals