EasyManua.ls Logo

Allied Telesis CentreCOM GS970M Series - Unpacking the Switch: GS970 M;18 and GS970 M;18 PS

Allied Telesis CentreCOM GS970M Series
100 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GS9790M Series Switch Installation Guide
51
Unpacking the switch: GS970M/18 and GS970M/18PS
To unpack the switch, perform the following procedure:
1. Remove all of the components from the shipped package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. Verify that the shipped package includes the following items:
1 Power cable hook
GS970M/18 or
GS970M/18PS
1 Power cable (1.8m)
1 Console cable (2m)
M
AC
Ad
d
r
es
s
La
b
e
l

Table of Contents

Other manuals for Allied Telesis CentreCOM GS970M Series

Related product manuals