Chapter : Chapter 2: Installation
50
Unpacking the switch:GS970M/10 and GS970M/10PS
To unpack the switch, perform the following procedure:
1. Remove all of the components from the shipped package.
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. Verify that the shipped package includes the following items:
1 Power cable hook
GS970M/10 or
GS970M/10PS
1 Power cable (1.8m)
1 Console cable (2m)
C
O
N
SO
L
E
R
S-2
3
2
SD
F
AU
LT
PO
W
ER
S
D
10
00
L
I
N
K
A
C
T
1
0/
1
0
0
L
I
N
K
AC
T
P
D
O
N
PD
E
RR
M
A
X
C
U
R
R
E
N
T
SFP
9
1
0
2
4
68
13
57
MA
C Addr
e
s
s
L
a
be
l