Chapter 6: Installing the Switch on a Wall
134
Figure 74. Installing Two Brackets on the x530L-28GPX, x530L-28GTX,
x530L-52GPX, or x530L-52GTX Switch
Figure 75. Installing Four Brackets on the x530L-10GHXm
Brackets positions
the front panel on the left.
to install the switch with
Brackets positions
the front panel on the right.
to install the switch with
4568
3
5179111315
17
19 21
23 27/S1
28/S2
25
SFP+
26
AT-x530L-28GTX
16
18
2014
10G/
1G
468
10 12
2
22
24
FDX H
DX
C
OL
1G LINK
AC
T
1
0
0
LINK A
C
T
5G/
2
.
5
G/1G
L
I
N
K
ACT
10
0 LI
N
K
A
CT
PORTS
2
1-24
POR
T
S
1-20
5G/2.5G/1G/100
CO
NS
OLE
4568
3
5
1
7
9
11
13
15
17
19
21
23 27/S1
28/S2
25
SFP+
26
AT-x530L-28GTX
16
1
8
20
14
10G/
1G
4
6
8
10
12
2
22
24
FDX
HDX
COL
1G LI
NK
ACT
100 LINK
ACT
5G/2
.5G/1G LINK
ACT
100 LINK
ACT
PORTS 21-24
PORTS 1-20
5G/2.5G/1G/100