98 2014-07-30 127139 13
To prevent this from happening, the insertion tube and
the well must be dried. This is done by heating up the
calibrator to min. 100°C/212°F until all water left has
evaporated.
Remove the insulation plug while heating up.
It is very important that humidity in the well and insertion
tube is removed to prevent corrosion and frost
expansion damages.
Remove the insertion tube from the calibrator using the tool for
insertion tube supplied with the instrument (see fig. 14).
Fig. 14
Tool for insertion tube
Tool for insertion tube
Insertion tube
Hole for tool for insertion tube