Parameter Setting Range
Cycle Crank Time 5 - 15 sec
DTC Support On or Off
ECU Control Output Select Fuel or Pre-Start Contact
ECU Pulsing Disable or Enable
ECU Pulse Cycle Time 1 - 60 min
ECU Response Time-out 1 - 60 sec
ECU Settling Time 5,500 - 30,000 msec
ECU Support On or Off
Engine Shutdown Time 1 - 60 sec
Engine Start/Stop Configuration Not Configured or Volvo Penta
Engine Maintenance Cycle Pre-Alarm Level 0 - 5,000 hrs
Fuel Level Sender Failure Pre-Alarm Enable On or Off
Generator Rotation ABC or ACB
Generator CT Primary Amps 1 - 5,000 Aac
Generator Frequency 50 Hz or 60 Hz
Generator kW Rating 5 - 9,999 kW
Generator PT Primary Volts 1 - 999 Vac
Generator PT Secondary Volts 1 - 480 Vac
Generator Connection
3-phase L-L
3-phase L-N
1-phase A-B
1-phase A-C
Global Sender Failure Alarm Delay 1 - 30 sec
High Coolant Temperature Alarm Enable On or Off
High Coolant Temperature Pre-Alarm Enable On or Off
High Coolant Temperature Pre-Alarm Threshold
100 - 280°F
High Coolant Temperature Alarm Delay 60 sec
High Coolant Temperature Alarm Threshold
100 - 280°F
LCD Contrast 25 - 75%
Loss of Generator Voltage Alarm Enable On or Off
Low Battery Voltage Pre-Alarm Enable On or Off
Low Battery Voltage Pre-Alarm Threshold 6 - 12 Vdc or 12 - 24 Vdc
Low Battery Pre-Alarm Delay 1 - 10 sec
Low Coolant Temperature Pre-Alarm Enable On or Off
Low Coolant Temperature Pre-Alarm Threshold
50 - 100°F
Low Fuel Level Alarm Enable On or Off
Low Fuel Level Alarm Threshold 0 - 100%
Low Fuel Level Pre-Alarm Enable On or Off
Low Fuel Level Pre-Alarm Level 10 - 100%
Low Oil Pressure Arming Delay 5 - 15 sec
Low Oil Pressure Pre-Alarm Enable On or Off
Low Oil Pressure Pre-Alarm Threshold 3 - 150 psi
Low Oil Pressure Alarm Enable On or Off