EasyManua.ls Logo

Beumer stretch hood S - Hoist

Default Icon
192 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BEUMER stretch hood® S
Installation
BA-6090103-EN
19.08.09
37
Hoist
First, the transport safety devices are loosened or removed. The hoist is set up
carefully and placed on the marked supporting points. The hoist is to be fas-
tened with at least two dowels so as to prevent it from tipping over. The other
dowels are to be fastened after installation of the platform.
1 Transport route
2 Central axis of the hoist
How to mount the
hoist
1. Fasten adequate load carrying attachments to the diagonal bracing.
2. Remove the transport safety device.
3. Lift the hoist, place it on the marked supporting points and align it.
4. Fasten the hoist with dowels.

Table of Contents