EasyManua.ls Logo

Beumer stretch hood S - Commissioning Safety and Initial Start-up; Commissioning Safety Instructions; Initial Start-up Requirements

Default Icon
192 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BEUMER stretch hood® S
Commissioning
BA-6090103-EN
19.08.09
45
6 Commissioning
Safety instructions
The machine/system must be operated by trained or instructed personnel only.
Danger!
An unauthorised use of the machine/system could result in severe per-
sonal injury or death and damage to the system.
The machine/system must not be switched on if defects jeopardise the opera-
tional reliability.
First start-up
Basic requirements
Before starting the machine/system, check the following points:
The installation has been carried out according to the operating instructions.
There is no foreign matter (tools, auxiliary material etc.) in the system.
The bearings have been correctly mounted, aligned and filled with lubricant
according to the lubrication list.
The drive unit (motor, gear unit, coupling, chain drive, belt drive etc.) has
been correctly mounted, aligned and filled with lubricant according to the lu-
brication list.
The operating voltage corresponds to the voltage indicated on the motor
rating plate.
The sense of rotation of the individual drive components corresponds to the
conveying direction.
The intended safety devices have been mounted and are fully functional.
Before start-up, ensure that nobody is endangered by the starting ma-
chine/system.
Warning!
There is risk of injury when the machine/system is switched on while the
protective devices are not mounted.
Operate the machine/system only if all protective and safety devices are in
place and fully functional!

Table of Contents