EasyManua.ls Logo

Biotage Selekt - Inspect the Tubing; Start up the System

Biotage Selekt
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Biotage
®
Selekt User Manual | © Biotage 2020
Prepare the System
Figure 14
P/N 412358
P/N 412537
. SNAP XL column with SNAP XL fittings with Luer connections.
Figure 15
. The C1, C2, R1, and R2 ports on the right side of the system.
Inspect the Tubing
Warning
»
Shut down the system before replacing any tubing. Use only
tubing designed for the Selekt system and supplied by Biotage.
Inspect all tubes before each run to ensure that they do not
show signs of wear or damage and that they are properly
connected and tightened. Use caution when finger tightening
fittings to prevent stripped threads or crushed ferrules.
All external tubing on the system except for the tubing on the
collection arm can be replaced by the user.
Note: All tube types, dimensions, and lengths are essential
for the performance of the system. Only replace tubes with the
equivalent tubes designed for the Selekt system and supplied
by Biotage.
Start Up the System
Turn on the system using the power switch located on the left
side of the system; see Figure 16.
Figure 16. The power switch is located on the left side of the system.

Table of Contents

Other manuals for Biotage Selekt

Related product manuals