EasyManua.ls Logo

Broadcom Brocade 7850 - Quick Installation Checklist

Broadcom Brocade 7850
103 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7850-Install-IG101 Installation Guide
Brocade
®
7850 Extension Switch Hardware Installation Guide
Quick Installation Checklist
The following checklists provide a high-level overview of the basic installation process from the planning stage to the point
where the device comes online and is ready to be deployed. Completing all the tasks in the suggested order ensures
successful installation. Print these checklists and take them to the installation site.
Preinstallation Tasks
Review all installation requirements ahead of time as part of your site preparation. Careful planning and site preparation
ensure a seamless installation, especially when installing multiple devices.
Table 5: Installation Prerequisites
Task Task Details or Additional Information
Unpack the device. Take an inventory of the hardware components included in your shipment. See Shipping Carton
Contents.
Gather the necessary
components and required tools.
Review the time and items that are required at the beginning of each section to ensure that you have
gathered all the necessary components that are required for the following installation tasks:
Mounting the Device
Installing Transceivers and Cables
Power Supply Assemblies
Fan Assemblies
Review the safety precautions. See Safety Precautions. For the translation of these messages, see Cautions and Danger Notices.
Plan the installation. Decide whether you want to install the unit on a flat surface or in a rack. For rack installation, obtain
the appropriate rack mount kit. See Mounting the Device.
Review and verify the
installation requirements.
Verify that the following requirements are met. See Facility Requirements.
Power requirements
Environmental requirements
Clearance for a stand-alone or rack installation
Gather the network
configuration parameters.
IP address:
Subnet mask:
Default gateway IP address:
Domain ID:
Time zone:
Installation and Initial Configuration
The initial setup includes mounting the device on a flat surface or in a rack, and then completing the configuration tasks
necessary to bring the device online and verify the operation.
7850-Install-IG101
17

Table of Contents

Related product manuals