Instruction Manual for Lenus Care Bed
Page 29
3.10 PUTTING INTO SERVICE
It is only necessary to take an electrical measurement before putting the bed into
service for the first time if the bed has a 230-volt supply cable. In the case of beds with
a 24-volt power adapter, no electrical measurement is necessary, since these beds are
tested for electrical safety and functionality by the manufacturer before they leave
factory in perfect condition.
Before putting the bed into service for the first time:
• Remove all transport securing devices and packaging film.
• Clean and disinfect the bed.
• Allow the bed to acclimatise to room temperature for about 20 minutes if it was stored
beforehand at the lowest or highest permissible temperature (see chapter 9.4on
storage temperature).
• Perform an initialisation of the control unit (see chapter 6.5.4).
• After the bed has been assembled, carry out a check in accordance with the
checklist in chapter 3.10.1.
Before putting the bed into service each time:
Check that:
- The bed has been cleaned and disinfected.
- The castors are braked.
- The power supply is compatible with the technical data of the bed (230 volt AC, 50/60
Hz).
- Easy access to the mains plug is ensured at all times so that the bed can be
disconnected from the mains, if necessary.
- The power adapter/power plug is plugged in and the cable is routed in such a way
that it cannot be damaged during bed adjustments or by being driven over.
- The power adapter/power plug, drive cables and handset cable cannot be damaged
by moving parts of the bed.
- No obstacles such as bedside cabinets, supply rails or chairs will inhibit adjustments.
- All adjustment functions are in proper working order and have been checked (see
chapter 3.10.1).
The care bed may be put into operation only after all these checks have been
carried out!