EasyManua.ls Logo

Carrier ChillerVu - To Wire to a CCN Network

Carrier ChillerVu
78 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Wiring for communications
Carrier® ChillerVu™
(OPN-PSM-MPCXPE) Carrier Proprietary and Confidential CARRIER CORPORATION ©2017
Installation and Start-up Guide 26 All rights reserved
To wire to a CCN network
1 Turn
off
the Carrier® ChillerVu™'s power.
2 Verify that DIP switch
5
is set to
CCN
.
3 Verify that Port S2 is set up for EIA-485 2-wire (Half Duplex). .
4 Connect the Carrier® ChillerVu™'s Port S2 to the CCN bus. Use the same polarity throughout the network
segment.
Wire this Port S2 terminal
To this CCN device terminal
Signal Ground (Pin 5)
G
Net- (Pin 2)
-
Net+ (Pin 1)
+
NOTE
The CCN Shield should be tied/taped back or daisy chained if the Carrier® ChillerVu™ is not at one
end of the bus.
5 Turn
on
the Carrier® ChillerVu™'s power.
NOTE
The default CCN address for the Carrier® ChillerVu™ is Bus 0, Element 1. See To scan and download CCN
devices (page
34).

Table of Contents

Related product manuals